PACTA 2017 - Flipbook - Page 11
FAQ
PACTA
RESPONSE
PACTA
RESPONSE
OWNERS
CHALLENGE
PLANNERS & FACILITY MANAGERS
INSTALLATION, MAINTENANCE
SPACE
UTILITY CAPACITY
• No room for
new LC
• Not room for
LC's along both
walls in a std 3
metre grid
• Not sufficient
handling space
in front of LC's
• No space
for ducts for
new HVAC
(refurbish)
• HVAC capacity
is limited
• New HVAC
capacity is too
expensive for
the LC case
• EHS issues
occur due
to noise in
existing and
overloaded
ventilation
systems; air
velocities are
high
CONSTRUCTABILITY
PERMITS
RISK
COST
• Complex
installation
• 3D space
management
• Fire permits
• Unexpected
derived
• Limitations
tasks during
on allowed
refurbishing
quantities of
may create
flammable
more jobs,
liquids
with no notice
• Requirements
dealing with EX • Installation
in QC-areas
conditions and
are restricted
enforced shutin time and
downs
frequency
• Space
utilization is
cost driver no.
1 in labs
• Venting/
cooling is cost
driver no. 2 in
labs
• Designers do
expensive
tailored
solutions
• Few standard
products on the
market
• Minimum
• Ventilation
footprint
may be less
than 60% of
• ONLY the
capacities used
footprint
in comparable
required by EHS
solutions
and LC-system
is needed
• Depends on
case
• Off-the-shelf
PACTAs for
most LCsystems
• Few and
simple
interfaces
• PACTA Fuego
is used where
quantity
restrictions are
applied
• Cost
• Or less! As
focused
heat venting
reduces the
installation
depth needed.
• This may open
for LC-system
installations
along both
walls in the
same room,
the safety
corridor is
place
• KD Knock down • Request for
installation
information
• Refer to
• Cooperation
PACTA Site
with fire
Preparation
authorities are
Guide. Note
needed prior
floor load
to final design
requirements
and approval
• 25% is for
ventilating
solvents
• 75% is for
ventilation of
heat exhaust
from LC-system
• Ventilation
can be split
into two, and
the heat can
be cooled and
recirculated
• Install two-for-one = two PACTA's
- one for new LC and one for
existing LC.
• No extra HVAC may be needed!
• Easy to install
• Complies to
rules and
standards
• PACTA comes,
pre-tested and
as knock-down
solution
• “First time right”
by upfront
alignment
with Corporate
Health and
Safety
• Space & HVAC
savings makes
TIC favourable
• Use of standard
solution
reduces design
costs
• The simplicity
in solution
reduces overall
risk
• Depends on
case and
alternative
Scientists & technicians | 11